VPRPL-RBIPL-JDA-JV received Letter of Acceptance from the Office of Executive Engineer Jaipur Development Authority. The Letter of Acceptance pertains to the project titled "Engineering, Procuring, Construction, Commissioning (EPC) and performance run followed by O&M of sewerage Treatment plant of 30 MLD capacity at Swarn Vihar, Sanganer of Jaipur City based on Sequential Batch Reactor (SBR) Technology."
Following the submission of the tender VPRPL-RBIPL-JDA-JV has been selected as the chosen contractor for this significant endeavor. The tender, evaluated and accepted by the competent authority, having a total value of Rs. 513.99 million.
We look forward to collaborating closely with Jaipur Development Authority and stakeholders to ensure the successful completion of the Project.
Shares of Vishnu Prakash R Punglia Limited was last trading in BSE at Rs. 254.30 as compared to the previous close of Rs. 250.15. The total number of shares traded during the day was 36816 in over 854 trades.
The stock hit an intraday high of Rs. 257.50 and intraday low of 248.00. The net turnover during the day was Rs. 9316002.00. |